Created on 14 Oct 2018
An Omnidirectional Electric Skateboard
Part | Cost | Quantity | Total |
91274A131 | $5.62 | 1 | $5.62 |
M5 SHCS 20mm it is a screw | |||
7804k148 | $10.54 | 1 | $10.54 |
Bearing 9mm ID 17mm OD it is a bearing | |||
91292A031 | $9.48 | 1 | $9.48 |
M2 SHCS 18mm it is a screw | |||
91239A705 | $7.73 | 1 | $7.73 |
M2 BHCS 8mm it is a screw | |||
97763A816 | $6.67 | 1 | $6.67 |
M4 BHCS 8mm it is a screw | |||
91390A087 | $3.23 | 5 | $16.15 |
M1.6 Set Screw 3mm it is a setscrew | |||
92010A802 | $4.44 | 1 | $4.44 |
M2 14mm FHCS it is a screw | |||
DRV8825 Driver | $9.00 | 1 | $9.00 |
used to control the nema | |||
91294A135 | $11.39 | 1 | $11.39 |
M3 FHCS 20mm it is a screw | |||
97763a812 | $6.67 | 1 | $6.67 |
M3 BHCS 6mm it is a screw | |||
92871A013 | $1.72 | 3 | $5.16 |
Spacer 10mm Long M3 it is a spacer | |||
Tiger Motor F60III | $26.00 | 1 | $26.00 |
used to rotate the wheel | |||
ESC | $22.00 | 1 | $22.00 |
used to control the tiger | |||
NEMA 23 | $14.00 | 1 | $14.00 |
used to spin the wheel | |||
91290A017 | $11.55 | 1 | $11.55 |
M2 SHCS 10mm it is a screw | |||
LiPo Battery Pack | $15.00 | 2 | $30.00 |
used to power the motors | |||
Power Distribution Boards | $16.00 | 1 | $16.00 |
used to distribute power | |||
Mini Breadboards | $7.90 | 1 | $7.90 |
used for wire connectivity | |||
Actuator | $2.60 | 1 | $2.60 |
used to detect location | |||
Proximity Sensor | $2.90 | 1 | $2.90 |
used to detect location | |||
PS2 Controller | $9.00 | 1 | $9.00 |
used to control the module | |||
91294A130 | $4.81 | 1 | $4.81 |
M3 FHCS 10mm it is a screw | |||
91253A539 | $11.73 | 1 | $11.73 |
1/4-20 0.625in FHCS it is a screw | |||
91290A059 | $7.85 | 1 | $7.85 |
M2.5 SHCS 30mm it is a screw | |||
91239A769 | $10.71 | 1 | $10.71 |
M2.5 BHCS 25mm it is a screw | |||
7804K145 | $8.66 | 1 | $8.66 |
Bearing 8mm ID 12 mm OD it is a bearing | |||
97763A811 | $6.67 | 1 | $6.67 |
M3 BHCS 5mm it is a screw | |||
93625A102 | $10.25 | 1 | $10.25 |
M2.5 Locknut it is a nut | |||
90576A104 | $4.50 | 1 | $4.50 |
M5 Locknut it is a nut | |||
Project Totals: | 36 | $299.98 | |
Track 2 Base Budget: | $250.00 | ||
Preferred Vendor Budget Bonus: | $50.00 | ||
Remaining Budget: | $0.02 |